All tenders
BidClosedVerified details
GEM/2026/B/8152148
Auma make spare 1,Auma make spare 2,Auma make spare 3,Auma make spare 4,Auma make spare 5,Auma make
Login to Download₹5,000FREE
Published
14 Oct 2026, 02:23 pm
Closes
24 Oct 2026, 04:00 pm
Pre-bid meet
—
Bid opening
25 Oct 2026, 04:00 pm
Financial details
Estimated value₹ 30,77,489
EMD amount—
ePBG %—
Advisory bank—
Evaluation methodTotal value wise evaluation
Bid validity120 days
Buyer details
Ministry—
DepartmentEnergy Department Uttar Pradesh
OrganisationUttar Pradesh Rajya Vidyut Utpadan Nigam Limited
(uprvunl) Lucknow
OfficeLucknow
BoQ items (0)
Item details are not yet extracted for this tender.
Consignees (190)
| # | Consignee | Address | Qty | Delivery (days) |
|---|---|---|---|---|
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 3 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 2 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
| 1 | Sunil Kumar Gangwar | 231219,Obra Thermal Power Plant | 1 | 60 |
Exemptions & flags
MSE exemption—
Startup exemption—
OEM required—
Quick facts
Bid ID10025440
Quantity286
Status1
Details fetched19 Oct 2026, 08:34 am
Contact us about this tender
Need help bidding on this tender? Send us your details and our team will reach out.
