All tenders
BidLive · 6 days leftVerified details

GEM/2026/B/7605640

All in One PC (V2)

Published

03 Jun 2026, 05:02 pm

Closes

15 Jun 2026, 06:00 pm

Pre-bid meet

Bid opening

15 Jun 2026, 06:30 pm

Financial details

Estimated value
EMD amount
ePBG %
Advisory bank
Evaluation methodTotal value wise evaluation
Bid validity180 days

Buyer details

MinistryPMO
DepartmentDepartment of Atomic Energy
OrganisationN/a
OfficeTata Institute Of Fundamental Reseach
Buyer
Email
Phone

BoQ items (0)

Item details are not yet extracted for this tender.

Consignees (9)

#ConsigneeAddressQtyDelivery (days)
a. There is no requirement that the OEM of the All in One PC should be a device partner of Microsoft or hold a valid authorisation from Microsoft b. Microsoft OS may be sourced directly from Microsoft by OEMs holding device partner status, and those not holding device partner status may source from authorized distributors,i.e., Ingram/Reddington and their authorized channel partners. 5 /
For Sellers:
1Pravin Prabhakar Mane400005,1 Homi Bhaba Road, Colaba130
2.Changing or altering the configurationSeller must refrain from changing or altering the configuration of the factory pre-loaded machine. The machine should be delivered to the Consignee in its original, factory-approved configuration.
3.WarrantyThe seller shall furnish a valid warranty Certificate/Tag from the OEM to the purchaser, guaranteeing the product's coverage under the specified warranty terms. The warranty certificate should be verifiable through the OEM website/customer care center.
4.Compliance of extended producer’s responsibilityWith effect from 1.4.23, as per the E-waste rules 2022, EPR registration is mandatory for manufacturing entities. Therefore, all OEMs shall hold valid EPR registration, and the registration number should be reflected in the catalog parameter. OEMs shall ensure compliance with all responsibilities as per EPR registration applicable from time to time.
5.Mandatory / Statutory requirements as applicableOEMs shall have to ensure compliance with the mandatory/statutory requirements as per the Government of India Notifications issued from time to time for hardware and software components, as applicable.
6.Operating SystemIt shall be the responsibility of OEMs to ensure that supplies are made with genuine operating systems.
7.HDD/SSD Storage RetentionBuyer may add their requirement of retention of securely store all Hard Disk Drives (HDDs) or Solid-State Drives (SSDs) used in the All in One PC under ATC clause.

Exemptions & flags

MSE exemption
Startup exemption
OEM required

Quick facts

Bid ID9402773
Quantity1
Status1
Details fetched10 Jun 2026, 11:31 am