All tenders
BidLive · 4 days leftVerified details
GEM/2026/B/7632024
Entry and Mid Level Desktop Computer
Login to Download₹5,000FREE
Published
06 Jun 2026, 03:54 pm
Closes
13 Jun 2026, 04:00 pm
Pre-bid meet
—
Bid opening
13 Jun 2026, 04:30 pm
Financial details
Estimated value—
EMD amount—
ePBG %—
Advisory bank—
Evaluation methodTotal value wise evaluation
Bid validity30 days
Buyer details
MinistryMinistry of Finance
DepartmentDepartment of Financial Services
OrganisationState Bank Of India (sbi)
OfficeJaipur
Buyer—
Email—
Phone—
BoQ items (0)
Item details are not yet extracted for this tender.
Consignees (9)
| # | Consignee | Address | Qty | Delivery (days) |
|---|---|---|---|---|
| 1 | Mukesh Bajiya | 332001,SBI, Regional Buisness Office-5, Dhodh Panchayat Samiti Parisar, Sanwali Road, Sikar. | 8 | 30 |
| 3 | Requirement of OEM logo | Buyers are advised to note that incorporating a condition stipulating an OEM logo on the motherboard is restrictive and may not be incorporated into the bids. | — | — |
| 4 | Processors | Intel and AMD Processors are added as per Model Technical Specification of Desktop Computer issued by Ministry of Electronics and Information Technology (MeitY-IPHW Division) W-43/4/2020 dated 19 Aug 2024 | — | — |
| 5 | Scope of Installation | Installation requirements shall be indicated in the bid by the buyer under the Installation, Commissioning and Testing in Bid (ICT) clause. In case installation is specified in the bid, it shall be the responsibility of the seller to ensure that all systems are installed and satisfactory working is shown to the consignee or authorized representative of the buyer. However, in case of Direct and L1 Purchase, installation of the computer system by the seller/OEM is mandatory. Installation does not include the supply of antivirus, MS Office, etc., which are to be separately procured by the buyer only. | — | — |
| 7 | Warranty | The buyer may ensure that as soon as supplies are received, a request for a warranty certificate is made, along with logging into the OEM website/call centre to verify the certificate. | — | — |
| 8 | OM related to MII, Local content and MeitY advice on Model technical specifications | Buyers are requested to refer to various OMs pertaining to DPIIT and MeitY, as issued from time to time, while making procurement and follow relevant provisions as applicable. | — | — |
| 9 | Check points during Acceptance of Supplies | Before generating the Consignee Receipt and Acceptance Certificate (CRAC), the consignee may inspect the system condition and verify that it complies with the agreed specifications and configurations. In the case of a large number of units to be procured, then the buyer may opt for bidding and accordingly stipulate conditions regarding installation, inspection by consignees/inspection agency. Consignees who receive the supplies should be vigilant and should complete checking to ensure that there is no scope for the supply of refurbished products. At the time of receiving supplies, the consignee may adhere to the following to ensure that any discrepancies in supplies can be flagged, taken into account, and reflected while generating the CRAC: i. Packing should be checked properly ii. A warranty certificate from the OEM should be insisted upon and checked. iii. Instruction manuals and the OS installed should be checked. iv. The machine serial number should also be checked through settings and can be verified from the OEM website. The above points are for guidance, and the buyer/consignee may take steps considered suitable by them for checking at the consignee end before acceptance of systems. v. An escalation matrix for customer grievance redressal shall be insisted upon by the buyer from the seller at the time of delivery. | — | — |
| 10 | HDD/SSD Storage Retention | Buyer may add their requirement of retention of securely store all Hard Disk Drives (HDDs) or Solid-State Drives (SSDs) used in the desktop computer under ATC clause. | — | — |
| 11 | Higher Configuration | The buyer may permit products delivered with advanced USB standards. For example, a USB Type-A 3.2 Gen 2 port may be acceptable in place of USB Type A Port (Version 3 point 2 Gen 1) | — | — |
Exemptions & flags
MSE exemption—
Startup exemption—
OEM required—
Quick facts
Bid ID9432050
Quantity8
Status1
Details fetched08 Jun 2026, 06:28 am