All tenders
BidLive · 9 days leftVerified details
GEM/2026/B/7812900
All in One PC (V2)
Login to Download₹5,000FREE
Published
28 Jul 2026, 11:20 am
Closes
07 Aug 2026, 12:00 pm
Pre-bid meet
—
Bid opening
07 Aug 2026, 12:30 pm
Financial details
Estimated value₹ 65,83,822
EMD amount₹ 1,31,677
ePBG %5.00%
Advisory bankState Bank of India
Evaluation methodTotal value wise evaluation
Bid validity120 days
Buyer details
MinistryPMO
DepartmentDepartment of Atomic Energy
OrganisationAnushakti Vidhyut Nigam Limited
OfficeMbrapp
BoQ items (0)
Item details are not yet extracted for this tender.
Consignees (8)
| # | Consignee | Address | Qty | Delivery (days) |
|---|---|---|---|---|
| For Sellers: | — | — | — | — |
| 1 | Amulya Malviya | 327001,Mahi Banswara Rajasthan Atomic Power Project, PO Napla, Tehsil Choti Sarwan, | 75 | 30 |
| 1. | OEM Website Link/Part No for product verification | The OEM shall share the OEM website link with the buyer at the time of delivery. The offered model details/configuration should be available on their website. A unique device serial number shall also be provided at the time of supply, which is also mentioned on the product. The buyer/consignee shall be able to verify the complete product details, including configuration, through the shared OEM website link. | — | — |
| 3. | Warranty | The seller shall furnish a valid warranty Certificate/Tag from the OEM to the purchaser, guaranteeing the product's coverage under the specified warranty terms. The warranty certificate should be verifiable through the OEM website/customer care center. | — | — |
| 4. | Compliance of extended producer’s responsibility | With effect from 1.4.23, as per the E-waste rules 2022, EPR registration is mandatory for manufacturing entities. Therefore, all OEMs shall hold valid EPR registration, and the registration number should be reflected in the catalog parameter. OEMs shall ensure compliance with all responsibilities as per EPR registration applicable from time to time. | — | — |
| 5. | Mandatory / Statutory requirements as applicable | OEMs shall have to ensure compliance with the mandatory/statutory requirements as per the Government of India Notifications issued from time to time for hardware and software components, as applicable. | — | — |
| 6. | Operating System | It shall be the responsibility of OEMs to ensure that supplies are made with genuine operating systems. | — | — |
| 7. | HDD/SSD Storage Retention | Buyer may add their requirement of retention of securely store all Hard Disk Drives (HDDs) or Solid-State Drives (SSDs) used in the All in One PC under ATC clause. | — | — |
Exemptions & flags
MSE exemption—
Startup exemption—
OEM required—
Quick facts
Bid ID9636492
Quantity75
Status1
Details fetched29 Jul 2026, 12:09 am