All tenders
BidLive · 10 days leftVerified details
GEM/2026/B/7841964
CRDS Living (Collapsible Rapidly Deployable Shelters)
Login to Download₹5,000FREE
Published
29 Jul 2026, 10:28 am
Closes
08 Aug 2026, 11:00 am
Pre-bid meet
—
Bid opening
08 Aug 2026, 11:30 am
Financial details
Estimated value—
EMD amount₹ 3,75,000
ePBG %3.00%
Advisory bankState Bank of India
Evaluation methodTotal value wise evaluation
Bid validity60 days
Buyer details
MinistryMinistry of Defence
DepartmentDepartment of Military Affairs
OrganisationIndian Army
Office***********
BoQ items (0)
Item details are not yet extracted for this tender.
Consignees (7)
| # | Consignee | Address | Qty | Delivery (days) |
|---|---|---|---|---|
| 1 | *********** | ***********Kachchh | 5 | 90 |
| 36 | Installation, Commissioning, Testing, Configuration, Training (if any - whichev er is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorized Reseller. | — | — | — |
| 37 | Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the enti re Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope all the components related to the equi pment (Upload an undertaking with the bid confirming compliance by the bi dder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidder undertaking). | — | — | — |
| 38 | Supplier shall ensure that the Invoice is raised in the name of Consignee wit h GSTIN of Consignee only. | — | — | — |
| 39 | Timely Servicing / rectification of defects during warranty period: After havin g been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within 3 days time limit. If the Seller fails to complete service / rectification with defined time li mit, a penalty of 0.5% of Unit Price of the product shall be charged as penalt y for each week of delay from the seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penal ty amount from the Performance Security (PBG).Cumulative Penalty cannot exceed more than 10% of the total contract value after which the Buyer shal l have the right to get the service / rectification done from alternate sources at the risk and cost of the Seller besides forfeiture of PBG. Seller shall be liable to re-imberse the cost of such service / rectification to the Buyer. | — | — | — |
| 40 | While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the Screen shot of GST portal confirming payment of GST. | — | — | — |
| 41 | Demonstration mandatory at department premises at OEM cost on demand of Technical Evaluation Committee. | — | — | — |
Exemptions & flags
MSE exemption—
Startup exemption—
OEM required—
Quick facts
Bid ID9669850
Quantity5
Status1
Details fetched29 Jul 2026, 06:28 am