All tenders
BidClosedVerified details

GEM/2026/B/7921144

All in One PC (V2)

What similar contracts sold for

6,491 past awards · 2,090 in the last 12 months
Typical low
₹78,900
Median
₹1,32,114
Typical high
₹3,41,750
₹12,000₹14,04,64,800

Based on past GeM contract awards in this category. Indicative only — actual value depends on quantity, specification and delivery terms.

Published

14 Aug 2026, 06:10 pm

Closes

24 Aug 2026, 07:00 pm

Pre-bid meet

Bid opening

24 Aug 2026, 07:30 pm

Financial details

Estimated value
EMD amount
ePBG %
Advisory bank
Evaluation methodTotal value wise evaluation
Bid validity30 days

Buyer details

Ministry
DepartmentForest Department Madhya Pradesh
OrganisationN/a
OfficeMpfdit

BoQ items (0)

Item details are not yet extracted for this tender.

Consignees (8)

#ConsigneeAddressQtyDelivery (days)
For Sellers:
1Avinash Joshi462003,O/o Principal Chief Conservator of Forests Wing (CAMPA) MP FOREST DEPARTMENT , Van Bhawan C Block, Link Road - 2, Tulsi Nagar BHOPAL130
2.Changing or altering the configurationSeller must refrain from changing or altering the configuration of the factory pre-loaded machine. The machine should be delivered to the Consignee in its original, factory-approved configuration.
3.WarrantyThe seller shall furnish a valid warranty Certificate/Tag from the OEM to the purchaser, guaranteeing the product's coverage under the specified warranty terms. The warranty certificate should be verifiable through the OEM website/customer care center.
4.Compliance of extended producer’s responsibilityWith effect from 1.4.23, as per the E-waste rules 2022, EPR registration is mandatory for manufacturing entities. Therefore, all OEMs shall hold valid EPR registration, and the registration number should be reflected in the catalog parameter. OEMs shall ensure compliance with all responsibilities as per EPR registration applicable from time to time.
5.Mandatory / Statutory requirements as applicableOEMs shall have to ensure compliance with the mandatory/statutory requirements as per the Government of India Notifications issued from time to time for hardware and software components, as applicable.
6.Operating SystemIt shall be the responsibility of OEMs to ensure that supplies are made with genuine operating systems.
7.HDD/SSD Storage RetentionBuyer may add their requirement of retention of securely store all Hard Disk Drives (HDDs) or Solid-State Drives (SSDs) used in the All in One PC under ATC clause.

Exemptions & flags

MSE exemption
Startup exemption
OEM required

Quick facts

Bid ID9760020
Quantity1
Status1
Details fetched15 Aug 2026, 12:04 am

Contact us about this tender

Need help bidding on this tender? Send us your details and our team will reach out.